American Marine’s tug American Challenger with crane barge Weeks 544. 7 July 2018.
Weeks 544 was brought into Honolulu Harbor and taken to Pacific Shipyards International, where she was floated on to the dry dock Ho‘ōla I Nā Moku to have some work done.